The following bi-monthly meetings were held with the PMG Kurnool and PMG Visakhapatnam
1 PMG Kurnool on 21-01-2015.
i. items taken up: Non-drawl of HRA to IP Dharmavaram sub division.
ii. In-sufficient accommodation to IP Piler, IP Madakasira & Rayachoti sub divisions.
iii. (Old items):IO/PO Incentives release & RPLI incentives:
Attended: S. Prasad Rao, C/S & P. Umamaheshwar IP Dharmavaram sub-division.
2 PMG Visakhapatnam on 23-01-2015.
i. Items taken up: Provision of power inverters to sub divisional heads,
ii. supply of batteries to lap tops supplied long back,
iii. (Old items) IO/PO Incentives release & RPLI incentives:
Attended: S. Prasad Rao, C/S & K. Sriramulu ASP (R) Visakhapatnam division.
Both the PMsG have responded well and assured to settle the problems ventilated Let us wait for written reply from the ROs.
TNPSC Sub Inspector Result 2015
ReplyDeleteTNPSC VAO Result 2015
TNPSC Group 1 Exam Answer Key
Delhi NMMS Answer Key 2015
MP NMMS Answer Key 2015
NTSE Stage 1 Answer Key 2015
SSC MTS Answer Key 2015
govt. Jobs
ReplyDeletetamil nadu ssc result
tripura madhyamik result
uk board nic result
maha board ssc result
bihar 10th result
cgbse 10result
orissa hsc result
goa ssc result
ap ssc result